Commissioning Completion Form O.L. Ref. Date: Primary Information Cluster Manager : Cluster : SA / ST BOQ Reference: Required Delivery Date: Required time on site: SLO Ref. SLD Ref. W3W Entrance Gate GPS: W3W Genset Position GPS: Delivery Commissioning Address: Completion Date: Rental Owner: Date: VENUE: BOQ AREA: SECTION: REF: The parties acknoledge that the signature of the present document certify that the installation for the corresponding Section is fully compliant with accepted Design, comissioning has been fully completed, and installation accepted to start Operations period Item List Revd. Installation Item Code Item type Installed by Date Comments QTY. CABLES DISTRIBUTION BOARD GENSET IC ITEM Cap ex / ITEM CODE SERIAL NUMBER MODEL NUMBER TYPE Cross hire Commissioning Form