RiverTALK FREE Ju l y 1 3 , 2 0 1 8 | Vo l u m e 9 , No. 0 6 Mabel Lake Road to get some repairs By Jackie Pearase Work to repair part of Mabel Lake Road is The cost to repair both sites (at kilometres alignment to a more geotechnically stable scheduled to...
More
RiverTALK FREE Ju l y 1 3 , 2 0 1 8 | Vo l u m e 9 , No. 0 6 Mabel Lake Road to get some repairs By Jackie Pearase Work to repair part of Mabel Lake Road is The cost to repair both sites (at kilometres alignment to a more geotechnically stable scheduled to get underway next week. 15 and 19) last year exceeded $500,000. location, which required property pur- The Ministry of Transportation and In- “These costs included traffic control, en- chase,” the ministry said. frastructure was on the roadway this April gineering and design, and a shift in the road to repair a collapsed section at kilometre 14 but hazards also appeared this spring on sections repaired last fall at kilometres 15 and 19. A crack spanning both lanes developed with spring runoff in March at kilometre 15 where the road was repaired and repaved last fall. The ministry is not planning re- pairs of this section at this time. “We are continuing to monitor this sec- tion and will consider further patching if it is needed to
Less