G-POS is a Real-Time Location System (RTLS) incorporating GPS technology.
It is embedded unobtrusively into the container terminals Container Handling Equipment (CHE) and automatically keeps track of every piece of mobile equipment on the terminal. G-POS...
More
G-POS is a Real-Time Location System (RTLS) incorporating GPS technology.
It is embedded unobtrusively into the container terminals Container Handling Equipment (CHE) and automatically keeps track of every piece of mobile equipment on the terminal. G-POS automatically monitors the storage and retrieval locations for every container handled on the terminal. It is a flexible solution and can be configured to meet the specific operational needs of any terminal with various additional modules and options.
Less