3 10.01 RCS 1554 NE 69TH PLACE - ANKENY - IA 50021 5" 515.289.3787 - rcsmillwork@rcsmillwork.com NOTE(S) PROJECT 1. RCS TO ASSEMBLE DOOR FRAMES AON OMAHA 2. PROVIDE ALL HARDWARE CUT 17807 BURKE STREET OMAHA, NE 68118 SHEETS AND LOCATIONS ITEM / PIVOT DOOR...
More
3 10.01 RCS 1554 NE 69TH PLACE - ANKENY - IA 50021 5" 515.289.3787 - rcsmillwork@rcsmillwork.com NOTE(S) PROJECT 1. RCS TO ASSEMBLE DOOR FRAMES AON OMAHA 2. PROVIDE ALL HARDWARE CUT 17807 BURKE STREET OMAHA, NE 68118 SHEETS AND LOCATIONS ITEM / PIVOT DOOR MILL # 16-33 ARCHITECT / PERKINS + WILL ARCHITECTURAL WOODWORK INSTITUTE GC / GRAHAM CONSTRUCTION 2 MATERIAL LEGEND 10.01 EXPOSED NAUF WD-10 = PG POPLAR 1 PLAN @ PIVOT DOOR 10.01 SCALE : 1/2" = 1'-0" REF: 76" (MIN) 2 2 10.04 10.04 SEMI-EXPOSED 1 1 10.04 10.04 EDGE BANDING 96" DOOR OPNG. 96" DOOR OPNG. 98" (MIN) HARDWARE WD-10 JAMB BEYOND WD-10 JAMB 1.75"DOOR: 1.75"DOOR: BY OTHERS BY OTHERS 72" DOOR OPNG. 72" DOOR OPNG. PROJECT NOTES GRADE / CUSTOM ISSUED FOR APPROVAL / ENGINEER / C.WEISER PLOT DATE / 3.7.2019 2 ELEVATION @ PIVOT DOOR 3 ELEVATION @ PIVOT DOOR PROJECT MANAGER / BL REVISION / 2 - 3.7.19 10.01 SCALE : 1/2" = 1'-0" REF: 10.01 SCALE : 1/2" = 1'-0" REF: JOB DRAWING PRELIMINARY 19029 10.01
Less